KEPCO Begins Reclaiming Connection Capacity: How Delayed or Speculative Projects Are Separated from Those on Track
KEPCO revised its grid-use rules so that connection capacity held by delayed or speculative generation projects can be reclaimed. Ahead of the 2026-09-20 grace-period deadline, we set out what separates projects on track from delayed ones.








